    Concrete Canvas used as part of improvement works for Scottish Canals

    Concrete Canvas used as part
    of improvement works for Scottish Canals

    16.%20Main%20CS%20Photo%20-%20Completed%20CC%20Installation%20EDIT.jpg

    Earlier this year Mackenzie Construction
    installed over 2000m2 of Concrete Canvas to provide an erosion
    protection layer for an open canal, which is the only formal water supply to
    the Union Canal which runs from Falkirk to Edinburgh. The Almond Feeder is just
    3km in length and has four masonry tunnels on the route which was opened in
    1822.

    After the Union Canal was closed in 1965, it
    reopened in 2001 and as such the canal feeders are routinely checked to ensure
    their structural security. When the Almond Feeder was checked, it was
    discovered that there were visual signs of ground movement which raised
    concerns over the stability of the channel. In order to protect the channel,
    remedial works were deemed essential, as without the Almond Feeder, the Union
    Canal would dewater. This would cause significant environmental, public,
    economic and navigational issues for the areas it flows through.

    A solution to protect the channel long-term was
    needed. Initially, the idea of lining the Almond Feeder with HDPE was
    considered. However, it quickly became apparent that there were multiple issues
    with this idea. The main one being, it was not possible to completely dry out
    the channel, as a result thermally welding the material would have been very
    difficult.

    One solution which was identified as being able
    to provide the necessary long-term protection against erosion, while also
    improving the impermeability of the channel was Concrete Canvas. Developed by
    two students while still at university back in 2004, this material is filled
    with a dry concrete mix and needs only to be hydrated and left to dry to form a
    fibre reinforced concrete layer. Produced by Concrete Canvas Ltd, the geotextile is available in a number of thicknesses,
    and for this project CC8TM, the 8mm thick product variant was used.
    When compared to HDPE, Concrete Canvas is more durable and is also resistant to
    UV exposure.

    The installation of Concrete Canvas
    differentiates it from traditional concrete solutions, such as poured or
    sprayed, in a number of ways. Firstly, it requires no plant or mixing equipment
    on site, which for projects that may have restricted access is hugely
    beneficial. Secondly, as the fabric arrives on site rolled and ready to be
    installed, it can significantly reduce the overall project time. Only hand
    tools are needed to cut the material into the desired length so they can be
    installed. Compare this to sprayed concrete, and it is a much more efficient
    process with significantly less waste. Furthermore, Concrete Canvas uses a high
    early strength concrete mix which allows it to reach performance strength just
    24 hours after hydration. Particularly useful in projects where water is
    present, Concrete Canvas cannot be over-hydrated and can even set underwater.

    For this channel lining project, this was critical as the Union Canal needed to continue
    receiving water from the Almond Feeder. Sections of the channel were dewatered,
    during which time the CC8 was installed and then hydrated, after which the
    water was allowed to run through the section.

    6.%20CC%20laid%20transversely%20&%20benched%20on%20either%20side.jpg

    The lengths of CC8 were laid transversely across
    the channel and the ends fitted into a pre-dug anchor trench to secure them
    using 250mm ground pegs. The anchor trench was then backfilled with either clay
    or excavated soil. All leading edges of CC8 at the masonry tunnels were
    captured in poured concrete to provide extra protection against undermining.
    Additional sections of fabric were then installed with 100mm overlaps and
    sealed using a bead of Soudaseal Adhesive sealant. These sections were then
    screwed together at 200mm internals with stainless steel screws.

    It took only four weeks to install the Concrete
    Canvas along the whole channel. The work included channel excavation to remove
    debris and was completed by just a 5-man crew. 2,125m2 of Concrete
    Canvas was used along the 3km channel, and the project finished on schedule.
    Mackenzie Construction were able to install over 40 linear metres of the GCCM
    per day, demonstrating just how fast Concrete Canvas can be installed.